| 1st phase of the Customer
Witness Test; Sean Sparks, Mr. Langone,
Mr. Gabriel and Dave Morris of Alcatel. Each "rack" of
equipment represents a site in the OCICS system. |
Mr.'s Gabriel, Morris, Langone and Boucher
working through the system checklist. |
Testing also consisted of performing site
by site through put and loop testing. |
| Mr. Boucher & Dep. Commissioner briefed
on channel bank equipment used to provision each radio
and data circuit. |
Sean Sparks brief's Dep Commissioner Munroe
on a typical site's status. Faults are
monitored continuously, providing detailed system conditions.
|
The alarm system, which provides a complete
picture of conditions, is monitored.
The program permits a "drill down" to any specific
issue, resulting in faster service response. |